刘世奇,男,汉族,中共党员,河北衡水人,1987年2月生。2006年-2016年在中国矿业大学(北京)分别获得采矿工程专业工学学士、硕士和博士学位,2016年-2018年在中国矿业大学(北京)安全科学与工程博士后流动站从事师资博士后的教学与科研工作,并于2016年7月留校任教至今,现为中国矿业大学(北京)能源与矿业学院讲师,独立指导硕士研究生。主要研究方向包括近水体(水体下、承压水体上和近导水构造)采煤、开采沉陷和井筒破裂防治方面的的理论和工程技术研究。参与国家973计划1项、国家自然科学基金1项,主持省部级重点实验室开放课题1项、校企联合横向课题十余项;获省部级一等奖2项、二等奖1项、三等奖2项;发表学术论文20余篇;获授权专利7项。
Brief Biography of Mr. Shiqi Liu
Shiqi Liuwas born in 1987 in Hebei province, China. Hereceived his B.E., M.E. and Ph.D. in mining engineering fromChina University of Mining and Technology, Beijing(CUMTB) in2010, 2013, and 2016, respectively, and he worked as a post doc inSafety Science and Engineering Post-doctoral Stationfrom 2016 to 2018. Now he is a lecturer inSchool of Energy and Mining Engineering, CUMTB. Dr.Liuhas dedicated himself to the study and application of special mining techniques, especially theories and techniques on mining near aquifers or surface water, mine water control, and shaft failure prevention. Dr.Liustudied on the evolution of groundwaterseepage field and crack field during mining operation, and he helped the safe mining under Weishan Lake and over Ordovician aquifers. He successfully proposed anaquifer-replenishment method to prevent shaft failure. Dr.Liuhas conducted and participated in several research projects from National 973 Plan, the National Natural Science Foundation, and well-known mining enterprises. Dr.Liuhas published over 20papers on peer-reviewed journals, and the selected ones are listed below:
[1] Prevention of mine-shaft failure by aquifer replenishment[J].Journal of Testing and Evaluation,2017,45(03):890-903.
[2]Grouting reinforcement of large building foundation over old gob areas: A case study in Huaibei Mining Area, China[J] Advances in Civil Engineering, Volume 2018, Article ID 8738752, 11 pages.
[3] 基于微观裂隙扩张的采场底板突水机理研究[J].采矿与安全工程学报,2016,33(04):624-629.
[4]注浆加固工作面底板岩体力学性质“增强-损伤”的定量测定[J].采矿与安全工程学报,2017,
[5] Mechanism analysis on floor heave and water inrush when rock roadway traversing faults above high-pressure water body[J].Int. J. of Mining and Mineral Engineering,2016,7(02):126-138.
[6]近距离厚煤层组工作面覆岩破坏规律实测研究[J].采矿与安全工程学报,2013,30(04):506-511.
[7]水体下综放开采的安全煤岩柱留设方法研究[J].煤炭科学技术,2014,(10):10-13.
Contact: Dr. Shiqi Liu,
School of Energy and Mining Engineering
China University of Mining and Technology, Beijing
Xueyuan Road D11, Beijing 100083, PR China
Tel.: +86-10-62339051, 13810175488
Email: 201845@cumtb.edu.cn, liushiqi0217@qq.com